No image available
· 2006
The large scale application of non-evaporable getter coating in RHIC has been effective in reducing the electron cloud. Since beams with higher intensity and smaller bunch spacing became possible in operation, the emittance growth is of concern. Study results are reported together with experiences of machine improvements: saturated NEG coatings, anti-grazing ridges in warm sections, and the pre-pumping in cryogenic regions.
No image available
· 2003
Polarized proton beam has been accelerated and stored at 100 GeV in Relativistic Heavy Ion Collider (RHIC) to study spin effects in the hadronic reactions. The essential equipment includes four Siberian snakes and eight spin rotators in two RHIC rings, a partial snake in the AGS, fast relative polarimeters, and ac dipoles in the AGS and RHIC. This paper summarizes the performance of RHIC as a polarized proton collider and of AGS as the injector to RHIC.
No image available
Recent beam experiments at BNL's AGS Booster have enabled us to study in more detail the effects of eddy currents on the lattice structure and our control over the betatron tune. The Booster is capable of operating at ramp rates as high as 9 T/sec. At these ramp rates eddy currents in the vacuum chambers significantly alter the fields and gradients seen by the beam as it is accelerated. The Booster was designed with these effects in mind and to help control the field uniformity and linearity in the Booster Dipoles special vacuum chambers were designed with current windings to negate the affect of the induced eddy currents. In this report results from betatron tune measurements and eddy current simulations will be presented. We will then present results from modeling the accelerator using the results of the magnetic field simulations and compare these to the measurements.
No image available
· 2006
Acceleration of polarized protons in the energy range of 5 to 25 GeV is particularly difficult: the depolarizing resonances are strong enough to cause significant depolarization but full Siberian snakes cause intolerably large orbit excursions and are not feasible in the AGS since straight sections are too short. Recently, two helical partial snakes with double pitch design have been built and installed in the AGS. With careful setup of optics at injection and along the ramp, this combination can eliminate the intrinsic and imperfection depolarizing resonances encountered during acceleration. This paper presents the accelerator setup and preliminary results.
No image available
· 2006
The NASA Space Radiation Laboratory (NSRL) at BNL was commissioned in October 2002 and the facility became operational in July 2003. NSRL was constructed in collaboration with NASA for the purpose of performing radiation effect studies for the NASA space program. NSRL can accept a wide variety of ions from BNL's AGS Booster; these are slow extracted with kinetic energies ranging from 0.3 to 3 GeV/n. Fast extraction from Booster to NSRL has also been developed and used. Many different beam conditions have been produced for experiments at NSRL, including very low intensity. In this report we will describe the facility and its performance over the eight experimental run periods that have taken place since it became operational. We will also describe the current and future capabilities of the NSRL.
No image available
No author available
· 1995