No image available
The main objective of the Safety evaluation report of FSAR-USAR (Chapter 17 - Quality assurance) conversion is review and expertly evaluate each change package, review of associated screening and safety evaluations, determination whether conclusions in safety screening and safety evaluation are adequate for change package and suggested of USAR if necessary.
No image available
· 1994
Practical direct procedure for fast transient stability assessment is developed. A corection of the well known PEBS method is preposed. Simulation approach of alarge interconnected power system dynamic lased on detailed models, is investiged. Solution of several practical system operation problems concerning power system dynamics is given.
No image available
The main objective of the Safety evaluation report of FSAR-USAR (Chapter 8 - Electric Power) conversion is review and expertly evaluate each change package, review of associated screening and safety evaluations, determination whether conclusions in safety screening and safety evaluation are adequate for change package and suggested of USAR if necessary.
No image available
Programski paket GREDOS smo že z verzijo Gredos/AV prenesli v okolje Windows in ga integrirali z geoinformacijskim sistemom (GIS). Verzija Gredos/MO, ki je v zaključni fazi izdelave, pa predstavlja povsem samostojno aplikacijo, ki omogoča tudi izračun zanesljivosti in podporo AutoCadovega formata DWG, vsebuje pa tudi modul za dostop do baze tehničnih podatkov v okviru DB2 V5.0 na HOST IBM 390 ob upoštevanju pravil avtorizacije, ki veljajo v Informatiki v distribucijskih podjetjih. V študiji je podana tudi analiza dosedanjega načina shranjevanja obratovalnih podatkov po posameznih distribucijskih podjetjih in zasnova priprave celovitega nabora obratovalnih podatkov za potrebe analize SN omrežij s programskim paketom GREDOS. Testiranje programskega paketa Gredos/MO za zainteresirane v distribucijskih podjetjih je predvideno v jeseni 1999, izdaja končne verzije programa Gredos/MO 1.0 in navodil za uporabo pa pred koncem leta 1999. Do takrat je na voljo že preizkušena verzija programskega paketa Gredos/AV.
No image available
No image available
No image available
V študiji s pomočjo modelnih raziskav prenosnega omrežja EES Slovenije in UCTE podajamo obsege velikosti možnih vklopnih kotov daljnovodov 400 kV ter 220 kV napetostnega nivoja. Velikosti vklopnih kotov na daljnovodih prenosnega omrežja Slovenije podajamo za pričakovana dnevna in nočna obratovalna stanja v interkonekciji leta 2001, s pretoki moči v smeri Slovenija - Italija v višini od 600 do 1000 MW. Zaradi zelo različnih velikosti vklopnih sunkov, odvisnih od velikosti kota in karakteristične moči omrežja na vklopnem mestu, so različni tudi vklopni sunki na bližnje aggregate ter obseg obratovalnih impedanc v zaščitnih karakteristikah distančnijev vodov. V ta namen podajamo optimalno velikost vklopnega kota za vsak posamezen daljnovod, ki bo zagotavljal možnost vklopa v večini obratovalnih stanj brez večjih posledic za naprave v sistemu.
No image available
· 2002
V študiji obravnavamo možnosti napajanja povečane odjemne moči 205 MW oz. 225 MW v 110-kV RTP Kidričevo, ki se pojavi v letu 2002 po izgradnji nove elektrolize v Talumu. V ta namen smo s pomočjo sigurnostne obratovalne analize n-1 možnih izpadov vodov preverili možnost napajanja preko obstoječega 110-kV omrežja vzhodne Slovenije. Dobljeni rezltati za trenutno najbolj neugodna obratovalna stanja tega dela omrežja kažejo, da je iz 110 kV RTP Kidričevo mogoče napajati povečan odjem v Talumu. Morebitne mejne obremenitve nekaterih 110 kV vodov je še mogoče obvladovati, potrebna je širša razvojna študija z upoštevanjem dolgoročne rasti porabe za del 110 kV napajalnega omrežja.
No image available
V študiji analizirano razmere ob izpadih osnovnega napajanja EES Krka iz RTP Bršljin za izvedbo čimbolj zanesljivega avtomatskega preklopa za pomožno napajanje iz RTP Gotna vas. V ta namen smo izdelali simulacijski model napajanja EES Krke in njegovi obnovi in po analizah obnašanja električnih veličin predlagali najbolj ustrezno izvedbo preklopnega avtomata in zaščitnega sistema.
No image available
· 1994
Danes dostopna tehnološka oprema omogoča primerno podporo pri upravljanju s podatki, njihovem prenosu in povezavo z uporabniki. Po temeljitih ocenah smo skupaj z naročnikom izbrali moderno in učinkovito okolje, v katerem je izdelan paket za Dnevno in Tedensko Planiranje obratovanja (DTP).