    The 2 x 400 kV Cirkovce-Pince transmission line is an upgrade to the national transmission electricity network and its connection with neighbouring countries. Based on the previous environmental impact assessment for this overhead power line, proposals were made to improve the project and assess the adequacy of the planned construction. According to 6 (4) of the Habitats Directive and the requirements of the European Commission, an additional alternative needs to be analysed, as the European Commission considers that the stated reasons for not choosing the alternative route for the transmission lines in Natura 2000 sites was insufficiently explained. This additional analysis of possible impacts of the planned transmission line in Natura 2000 sites and other protected nature areas has the purpose of examining the alternative transmission line route and it represents an addition to the content that is necessary for decision-making at the level of the European Commission. The document focuses on individual sections of the 2 x 400 kV OHL Cirkovce-Pince (Šturmovci area, the Formin canal, and the Krapje-Melinci section), on which significant impacts of the transmission line on birds have been identified and where, in the opinion of the Commission, an undergrounding of cables might reduce the need for compensatory measures for birds while maintaining as little impact as possible on other qualifying species and habitats. Starting points for conducting additional analyzes were factors in the wider environment. Technical, technological, and environmental aspects of undergrounding the cables in this area are examined, and in addition to this, nature conservation as well as economic factors of the alternative route of transmission lines in these areas are discussed in more detail.

  • No image available

  • No image available

  • No image available

    Študija obravnava pomembne tehnične, tehnično-ekonomske in tehnološke vidike v zvezi z obvladovanjem napetostnega profila na napetostnem nivoju 400 kV prenosnega omrežja javnega podjetja ELES. Že v prvem približku se je kot rešitev tega problema ugotovila potreba za vgraditev pod bremenom spremenljivih paralelnih dušilk (Variable Shunt Reactors - VSR). V nalogi so v izhodišču upoštevane reference, ki so navedene v Specifikaciji del (skupaj 9), ki je priloga 1 zgoraj citirane pogodbe, pri tem zlasti [8] in [9]. V predmetni študiji je podana ocena ugotovitev analize [8] ter obdelane opcije različnih velikosti in lokacije VSR. Navedene so standardne tehnične značilnosti naprav in podan nabor na trgu razpoložljivih proizvodov. Podani so rezultati obdelave vplivov preferenčnega tipa dušilk na EES in primerjalne gospodarnostne analize.

  • No image available

    V okviru remonta 400 kV stikališča (transformatorsko polje) V Nuklearni elektrarni Krško (NEK) je bila predvidena zamenjava dotrajanih 400 kV odklopnikov Westinghouse. Predmetni odklopniki se uporabljajo za vklapljanje in izklapljanje glavnih energetskih transformatorjev GT1 in GT2 s prestavnim razmerjem 400/21 kV, ki obratujeta paralelno. Na 21 kV strani energetskih transformatorjev sta na generatorske zbiralnice priključena tudi transformatorja lastne rabe T1 in T2. Odklopniki Westinghouse imajo na štirih prekinjevalnih mestih vgrajene predvklopne upore s skupno upornostjo približno 450 omega, ki se vklopijo 8,33 ms pred nastankom stika na glavnih kontaktih. Znano je, da se s tem ob vklopih zmanjšajo visoki vpadni tokovi (angl. inrush currents) v transformatorju med prehodnim pojavom. Novi odklopniki Aistom imajo dve prekinjevalni mesti in so brez uporov. Zaradi tega je pričakovati bistveno večje tokove ob vklopu transformatorjev. V okviru študije je obdelana problematika vklopnih oz. vpadnih tokov transformatorjev za razmere v NEK. Izvedene so bile meritve (snemanje časovnih potekov) napetosti in tokov ob vklopih v različnih razmerah (omrežje, odklopniki, transformatorji). Opravljena je bila primerjava razmer (obremenitve transformatorja) za stari in novi odklopnik. V zaključku je podan odgovor o ustreznosti odklopnika Alstom brez predvklopnih uporov glede stikalnih prenapetosti, vpadnih tokov in ustreznega delovanja zaščite ter obremenitev transformatorjev GT1 in GT2.

  • No image available

    V RTP 110/20 kV Lucija je 110 kV stikališče prostozračne izvedbe, 20 kV stikališče pa se s pomožnimi napravami, lastno rabo, napravami lokalnega krmiljenja in daljinskega vodenja, nahaja v zgradbi Elektra Primorska. V okviru novogradnje in rekonstrukcije RTP 110/20 kV Lucija se bo na lokaciji zgradilo novo 110 kV daljnovodno polje Izola, na za to rezerviranem prostoru EA03 ter rekonstruiralo polje DV 110 kV Koper EA01 in Vzdolžno ločitev EA05. Prav tako se bo preuredilo nizkonapetostno kabelsko kanalizacijo z jaški za potrebe ELES-a in rekonstruiralo rezervni prostor v zgradbi Elektra Primorske v komandni prostor za ELES. Zaradi novogradnje daljnovodnega polja DV 110 kV Izola na EA03 bo izvedena dograditev sekundarnih sistemov. Ohranijo se obstoječi transformatorski prostori, kinete in obstoječa daljnovodna portala. Prav tako se ohrani zaščita pred direktnimi atmosferskimi razelektritvami (zaščitne vrvi). [20] V študiji je predstavljena metoda po kateri se je izvedla analiza ustreznosti števila in namestitve zaščitnih elementov pred direktnimi udari strel.

  • No image available

    Študija obravnava analizo prenapetostne zaščite s prenapetostnimi odvodniki 110 kV GIS stikališča v HE Brežice. Izračun prenapetosti je opravljen na matematičnih modelih stikališča z uporabo simulacijskega programa EMTP-RV. Izdelan je bil simulacijski model z upoštevanimi električnimi lastnostmi visokonapetostnih naprav in povezav (transformatorji, kabli, itd.). Opravljene so bile računalniške simulacije ob udarili strel v fazni in zaščitni vodnik 110 kV in 400 kV daljnovoda. Program naloge je zajet v naslednjih točkah: ugotavljanje razmer za različne vrste prenapetosti, izdelava simulacijskega modela za simulacije prehodnih pojavov, izračun prenapetosti z uporabo računalniških metod, analiza prenapetosti z uporabo različnega števila prenapetostnih odvodnikov, zaključki in izdelava poročila. Rezultati analize temeljijo na računalniških simulacijah in izračunih, s katerimi smo potrdili izvedbo prenapetostne zaščite, ki vključuje izbiro karakteristik in ustrezno razporeditev prenapetostnih odvodnikov. Rezultat so pokazali, da predvidena prenapetostna zaščita, izvedena s ZnO prenapetostnimi odvodniki, učinkovito ščiti izolacijo visokonapetostnih naprav.

  • No image available

    V 110 kV stikališču HE Formin je stikališče prostozračne izvedbe in je z žično ograjo ločeno od HE Formin. Primarna oprema je dotrajana, sekundarna pa večinoma neustrezna. Sekundarna oprema stikališča ni ločena od objekta elektrarne. Prav tako se tam nahajajo komandni prostor, napajanje LR in sistem vodenja. 110 kV stikališče HE Formin bo zaradi zastarelosti stikališča in potrebne posodobitve tehnologije in tehnološke opreme rekonstruirano. Prav tako sekundarna oprema. [20] V okviru novogradnje in rekonstrukcije 110 kV stikališča HE Formin bo v celoti porušeno 110 kV prostozračno stikališče HE Formin (teren bo dvignjen). Na lokaciji se bo zgradilo novo zgradbo s 110 kV GIS stikališčem in komandnim delom, sekundarni sistem (zaščita, vodenje, meritve), TK sistem, sistem lastne rabe in transformator lastne rabe T121 110/20 kV. 110 kV energetski transformatorji in vsi 110 kV daljnovodi, bodo na novo 110 kV GIS stikališče povezani s 110 kV kabli. Novi 110 kV DV stebri so na stojnih mestih 1A, 3A in 53A, ob odstranjenih stebrih na mestih 1, 3 in 53. V študiji je predstavljena metoda po kateri se je izvedla analiza ustreznosti števila in namestitve zaščitnih elementov pred direktnimi udari strel.